Starting Point:
- The level of damage to shunting vehicles has risen disproportionately to the age of the vehicles
- Moreover, there are hardly any new vehicles available on the market
- Numerous data are collected in the search for causes – but so far without success concerning the establishment of meaningful links and structure
Activities BLC:
- Systematic modelling of the client’s entire maintenance process
- Forming hypotheses about possible causes for the high level of damage as part of expert discussions with representatives from workshops and headquarters
- Implementation of a powerful analysis tool in PowerBI to analyse the hypotheses in detail
- Derivation of effective measures to reduce the damage level in expert workshops
- Handover of the measures to the clients’ management and establishment of a reliable impact control via the implemented PowerBI tool
Key results:
- Maintenance process modelled end-to-end for the first time
- Powerful analysis tool implemented in Power BI
- Measures designed to reduce the damage level in the double-digit percentage range
- Measures handed over to the team and permanently tracked
- Power BI tool transferred to the client’s Asset Intelligence Centre and used there to permanently monitor success and to extend the analyses to other vehicle areas